ITAC Assessment: UU0240
ITAC logo
ITAC Assessment: UU0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product NA
NAICS 621111: Offices of Physicians (except Mental Health Specialists)
SIC 8011: Offices and Clinics of Doctors of Medicine
Sales Range less than $500
k
# of Employees 200
Plant Area 130,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,640
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,904 2,695,040
kWh
Electricity Demand $97,834 6,010
kW-mo/yr
Electricity Fees $16,932 -
Natural Gas $275,158 13,296
MMBtu
TOTAL YEARLY COSTS $486,828
RECOMMENDED SAVINGS* $14,455 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,408

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2612: Use cooling tower water instead of refrigeration $10,047 $10,320 $4,365
121,249
kWh
$5,682
-
kW-mo/yr
-
02 2.2121: Increase amount of condensate returned $1,601 $7,755 - - $1,601
-
MMBtu
03 2.6218: Turn off equipment when not in use $1,286 $1,500 $1,286
35,728
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $977 $113 $977
27,147
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $544 $1,387 $231
6,414
kWh
$313
-
kW-mo/yr
-
TOTAL RECOMMENDED $14,455 $21,075 $6,859
190,538
kWh
$5,995
-
kW-mo/yr
$1,601
-
MMBtu
TOTAL IMPLEMENTED $4,408 $10,755 $2,494
69,289
kWh
$313
-
kW-mo/yr
$1,601
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs