Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bread Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 63,210
ft2
Annual Production 9,360,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,602 7,480,108
kWh
Electricity Demand $115,960 14,033
kW-mo/yr
Electricity Fees $390 -
Natural Gas $65,643 23,873
MMBtu
TOTAL YEARLY COSTS $668,595
RECOMMENDED SAVINGS* $53,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,268 $21,268 $10,041
154,482
kWh
$2,227
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $9,537 $24,798 $7,237
111,344
kWh
$2,300
-
kW-mo/yr
- -
03 2.7243: Improve air circulation with destratification fans / other methods $2,597 $6,350 $2,597
39,953
kWh
- - -
04 2.2437: Recover waste heat from equipment $2,462 $7,500 - - $2,462
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,160 $456 $1,160
17,841
kWh
- - -
06 2.7135: Install occupancy sensors $1,039 $1,393 $1,039
15,978
kWh
- - -
07 4.631: Install an uninteruptable power supply $24,935 $1,665 - - - $24,935
TOTAL RECOMMENDED $53,998 $63,430 $22,074
339,598
kWh
$4,527
-
kW-mo/yr
$2,462
-
MMBtu
$24,935
TOTAL IMPLEMENTED $48,939 $49,580 $19,477
299,645
kWh
$4,527
-
kW-mo/yr
- $24,935
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs