Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product NA
NAICS 519120: Libraries and Archives
SIC 8231: Libraries
Sales Range less than $500
k
# of Employees 200
Plant Area 95,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,000
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,902 1,188,480
kWh
Electricity Demand $54,316 3,330
kW-mo/yr
Electricity Fees $13,625 -
Natural Gas $3,759 358
MMBtu
TOTAL YEARLY COSTS $114,602
RECOMMENDED SAVINGS* $13,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2522: Isolate hot or cold equipment $6,940 $1,552 $6,940
192,830
kWh
-
02 2.7313: Recycle air for heating, ventilation and air conditioning $6,263 $1,210 $2,905
80,696
kWh
$3,358
-
kW-mo/yr
03 2.7492: Use proper thickness of insulation on building envelope $90 $400 $90
2,506
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $63 $305 $63
1,748
kWh
-
TOTAL RECOMMENDED $13,356 $3,467 $9,998
277,780
kWh
$3,358
-
kW-mo/yr
TOTAL IMPLEMENTED $13,293 $3,162 $9,935
276,032
kWh
$3,358
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs