ITAC Assessment: UU0232
ITAC logo
ITAC Assessment: UU0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product NA
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range less than $500
k
# of Employees 45
Plant Area 48,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,106 420,371
kWh
Electricity Demand $31,391 1,924
kW-mo/yr
Electricity Fees $12,809 -
Natural Gas $34,557 3,191
MMBtu
TOTAL YEARLY COSTS $93,863
RECOMMENDED SAVINGS* $14,506 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,942 $26,160 $2,298
64,022
kWh
$4,644
-
kW-mo/yr
-
02 2.7229: Air condition only space necessary $5,219 $12,000 $1,701
47,326
kWh
- $3,518
-
MMBtu
03 2.9114: Use solar heat to make electricty $1,208 $2,720 $1,208
33,550
kWh
- -
04 2.6218: Turn off equipment when not in use $909 $425 $318
8,860
kWh
$395
-
kW-mo/yr
$196
-
MMBtu
05 2.6218: Turn off equipment when not in use $228 $170 $140
3,888
kWh
$88
-
kW-mo/yr
-
TOTAL RECOMMENDED $14,506 $41,475 $5,665
157,646
kWh
$5,127
-
kW-mo/yr
$3,714
-
MMBtu
TOTAL IMPLEMENTED $13,070 $38,585 $4,317
120,208
kWh
$5,039
-
kW-mo/yr
$3,714
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs