ITAC Assessment: UU0222
ITAC logo
ITAC Assessment: UU0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Plastic Medical Supplies
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 118,750
ft2
Annual Production 4,000,000
units
Production Hrs. Annual 4,608
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $501,968 7,722,431
kWh
Electricity Demand $157,124 12,786
kW-mo/yr
Electricity Fees $18,197 -
Waste Disposal Costs
Water Usage $10,886 1,581
Tgal
TOTAL YEARLY COSTS $688,175
RECOMMENDED SAVINGS* $100,885 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,681

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $1,013 $540 $1,013
15,432
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,896 $2,400 $4,896
74,588
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $2,681 $1,740 $2,681
38,631
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,772 $46,800 $17,800
273,858
kWh
$1,972
-
kW-mo/yr
05 2.2314: Replace heat treating oven with more efficient unit $35,027 $264,000 $32,938
506,739
kWh
$2,089
-
kW-mo/yr
06 2.9114: Use solar heat to make electricty $37,496 $421,400 $34,552
526,366
kWh
$2,944
-
kW-mo/yr
TOTAL RECOMMENDED $100,885 $736,880 $93,880
1,435,614
kWh
$7,005
-
kW-mo/yr
TOTAL IMPLEMENTED $25,681 $49,740 $23,709
363,878
kWh
$1,972
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs