Assessment Year | 2016 |
---|---|
Principal Product | Heating and ventilation equipment |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3444: Sheet Metal Work |
Sales Range | $50 M to 100M |
# of Employees | 425 |
Plant Area |
140,000
ft2
|
Annual Production | 1,320,000
pieces
|
Production Hrs. Annual | 2,635
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $312,563 | 5,718,250 |
kWh
|
$0.055 |
Electricity Demand | $151,397 | 19,960 |
kW-mo/yr
|
$7.59 |
Electricity Fees | $12,588 | - |
|
- |
Natural Gas | $121,450 | 28,410 |
MMBtu
|
$4.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $132,832 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $132,832 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $58,880 | $115,670 |
$38,980
639,010
kWh
|
$19,900
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $36,410 | $52,120 | - |
$36,410
-
kW-mo/yr
|
- | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $21,000 | $3,900 |
$11,920
195,940
kWh
|
$9,080
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,830 | $5,000 |
$4,770
78,220
kWh
|
$4,060
-
kW-mo/yr
|
- | - | |
05 | 2.8121: Apply for tax-free status for energy purchases | $1,980 | $2,000 | - | - | $1,980 | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,800 | $23 |
$970
15,905
kWh
|
$830
-
kW-mo/yr
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,290 | - |
$700
11,480
kWh
|
$590
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,280 | $690 |
$250
4,050
kWh
|
$60
-
kW-mo/yr
|
- | $970 | |
09 | 2.8123: Pay utility bills on time | $796 | - | - | - | $796 | - | |
10 | 2.4314: Use synthetic lubricant | $566 | - |
$306
5,014
kWh
|
$260
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $132,832 | $179,403 |
$57,896
949,619
kWh
|
$71,190
-
kW-mo/yr
|
$2,776 | $970 | ||
TOTAL IMPLEMENTED | $132,832 | $179,403 |
$57,896
949,619
kWh
|
$71,190
-
kW-mo/yr
|
$2,776 | $970 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs