Assessment Year | 2022 |
---|---|
Principal Product | Medical Devices |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $5 M to 10M |
# of Employees | 500 |
Plant Area |
120,000
ft2
|
Annual Production | 700,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $219,336 | 5,088,720 |
kWh
|
$0.043 |
Electricity Demand | $179,365 | 9,536 |
kW-mo/yr
|
$18.81 |
Electricity Fees | $270 | - |
|
- |
Natural Gas | $92,928 | 22,047 |
MMBtu
|
$4.21 |
TOTAL YEARLY COSTS | $491,899 | |||
RECOMMENDED SAVINGS* | $38,132 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,054 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $19,186 | $1,125 | - |
$19,186
-
kW-mo/yr
|
|
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $14,352 | $8,000 |
$628
14,608
kWh
|
$13,724
-
kW-mo/yr
|
|
03 | 2.4239: Eliminate or reduce compressed air usage | $2,786 | $1,000 |
$1,742
40,515
kWh
|
$1,044
-
kW-mo/yr
|
|
04 | 2.3212: Optimize plant power factor | $771 | $1,550 | - |
$771
-
kW-mo/yr
|
|
05 | 2.6218: Turn off equipment when not in use | $730 | $500 |
$730
16,970
kWh
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $307 | $329 |
$307
7,143
kWh
|
- | |
TOTAL RECOMMENDED | $38,132 | $12,504 |
$3,407
79,236
kWh
|
$34,725
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $37,054 | $10,625 |
$3,100
72,093
kWh
|
$33,954
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs