ITAC Assessment: UU0201
ITAC logo
ITAC Assessment: UU0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Medical Devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $5
M
to 10
M
# of Employees 500
Plant Area 120,000
ft2
Annual Production 700,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,336 5,088,720
kWh
Electricity Demand $179,365 9,536
kW-mo/yr
Electricity Fees $270 -
Natural Gas $92,928 22,047
MMBtu
TOTAL YEARLY COSTS $491,899
RECOMMENDED SAVINGS* $38,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,054

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3137: Use power during off-peak periods $19,186 $1,125 - $19,186
-
kW-mo/yr
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $14,352 $8,000 $628
14,608
kWh
$13,724
-
kW-mo/yr
03 2.4239: Eliminate or reduce compressed air usage $2,786 $1,000 $1,742
40,515
kWh
$1,044
-
kW-mo/yr
04 2.3212: Optimize plant power factor $771 $1,550 - $771
-
kW-mo/yr
05 2.6218: Turn off equipment when not in use $730 $500 $730
16,970
kWh
-
06 2.4322: Use or replace with energy efficient substitutes $307 $329 $307
7,143
kWh
-
TOTAL RECOMMENDED $38,132 $12,504 $3,407
79,236
kWh
$34,725
-
kW-mo/yr
TOTAL IMPLEMENTED $37,054 $10,625 $3,100
72,093
kWh
$33,954
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs