ITAC Assessment: UU0199
ITAC logo
ITAC Assessment: UU0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Toothpaste and mouth wash
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 250,000
ft2
Annual Production 12,000,000
units
Production Hrs. Annual 8,592
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $219,987 6,109,200
kWh
Electricity Demand $207,172 12,748
kW-mo/yr
TOTAL YEARLY COSTS $427,159
RECOMMENDED SAVINGS* $20,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2612: Use cooling tower water instead of refrigeration $9,239 $4,868 $8,778
243,841
kWh
$460
-
kW-mo/yr
02 2.2628: Utilize a less expensive cooling method $6,969 $37,350 $6,156
171,000
kWh
$813
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,884 $378 $1,769
49,146
kWh
$1,115
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,264 $2,575 $687
19,082
kWh
$577
-
kW-mo/yr
05 2.1113: Reduce combustion air flow to optimum $200 $564 $153
4,238
kWh
$47
-
kW-mo/yr
TOTAL RECOMMENDED $20,555 $45,735 $17,543
487,307
kWh
$3,013
-
kW-mo/yr
TOTAL IMPLEMENTED $10,503 $7,443 $9,465
262,923
kWh
$1,037
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs