ITAC Assessment: UU0198
ITAC logo
ITAC Assessment: UU0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Health Care
NAICS 622110: General Medical and Surgical Hospitals
SIC 8062: General Medical and Surgical Hospitals
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 44,353
ft2
Annual Production 456
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,539 1,153,761
kWh
Electricity Demand $20,589 2,634
kW-mo/yr
Electricity Fees $10,791 -
Natural Gas $47,136 5,650
MMBtu
Waste Disposal Costs
Water Usage $3,826 1,984
Tgal
TOTAL YEARLY COSTS $164,881
RECOMMENDED SAVINGS* $31,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,008

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7226: Use computer programs to optimize hvac performance $13,222 $12,000 $5,348
74,822
kWh
- $7,874
-
MMBtu
02 2.1224: Replace boiler $7,758 $4,499 - - $7,758
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $5,828 $12,000 $5,828
81,515
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,182 $17,630 $2,713
37,949
kWh
$469
-
kW-mo/yr
-
05 2.7224: Reduce space conditioning during non-working hours $1,018 $4,500 $75
1,043
kWh
- $943
-
MMBtu
TOTAL RECOMMENDED $31,008 $50,629 $13,964
195,329
kWh
$469
-
kW-mo/yr
$16,575
-
MMBtu
TOTAL IMPLEMENTED $31,008 $50,629 $13,964
195,329
kWh
$469
-
kW-mo/yr
$16,575
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs