ITAC Assessment: UU0190
ITAC logo
ITAC Assessment: UU0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product HDPE Conduit
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3084: Plastics Pipe
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 60,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,059 11,064,900
kWh
Electricity Demand $361,325 19,374
kW-mo/yr
Electricity Fees $67,664 -
Natural Gas $13,079 1,726
MMBtu
Waste Disposal Costs
Water Usage $9,275 4,175
Tgal
TOTAL YEARLY COSTS $836,401
RECOMMENDED SAVINGS* $26,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.2511: Insulate bare equipment $9,772 $5,582 $4,667
134,123
kWh
$5,105
-
kW-mo/yr
-
02 2.2692: Use outside cold water source as a supply of cooling water $8,939 $3,000 $47,420
1,362,703
kWh
$54,023
-
kW-mo/yr
$(-92,503.0)
-
Tgal
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,184 $2,500 $1,221
35,078
kWh
$1,963
-
kW-mo/yr
-
04 2.7272: Install heat pipes / raise cooling setpoint $2,942 $2,900 $1,771
50,896
kWh
$1,170
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,058 $778 $1,145
32,901
kWh
$913
-
kW-mo/yr
-
TOTAL RECOMMENDED $26,895 $14,760 $56,224
1,615,701
kWh
$63,174
-
kW-mo/yr
$(-92,503.0)
-
Tgal
TOTAL IMPLEMENTED - - - - -