| Assessment Year | 2021 |
|---|---|
| Principal Product | HDPE Conduit |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3084: Plastics Pipe |
| Sales Range | $50 M to 100M |
| # of Employees | 85 |
| Plant Area |
60,000
ft2
|
| Annual Production | 35,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $385,059 | 11,064,900 |
kWh
|
$0.035 | |
| Electricity Demand | $361,325 | 19,374 |
kW-mo/yr
|
$18.65 | |
| Electricity Fees | $67,664 | - |
|
- | |
| Natural Gas | $13,079 | 1,726 |
MMBtu
|
$7.58 | |
| Waste Disposal Costs | |||||
| Water Usage | $9,275 | 4,175 |
Tgal
|
$2.22 | |
| TOTAL YEARLY COSTS | $836,401 | ||||
| RECOMMENDED SAVINGS* | $26,895 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $9,772 | $5,582 |
$4,667
134,123
kWh
|
$5,105
-
kW-mo/yr
|
- | |
| 02 | 2.2692: Use outside cold water source as a supply of cooling water | $8,939 | $3,000 |
$47,420
1,362,703
kWh
|
$54,023
-
kW-mo/yr
|
$(-92,503.0)
-
Tgal
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,184 | $2,500 |
$1,221
35,078
kWh
|
$1,963
-
kW-mo/yr
|
- | |
| 04 | 2.7272: Install heat pipes / raise cooling setpoint | $2,942 | $2,900 |
$1,771
50,896
kWh
|
$1,170
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,058 | $778 |
$1,145
32,901
kWh
|
$913
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $26,895 | $14,760 |
$56,224
1,615,701
kWh
|
$63,174
-
kW-mo/yr
|
$(-92,503.0)
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs