Assessment Year | 2021 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 237110: Water and Sewer Line and Related Structures Construction |
SIC | 1623: Water, Sewer, Pipeline, and Communications and Power Line Construction |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
522,729
ft2
|
Annual Production | 924,371
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,825 | 3,465,000 |
kWh
|
$0.036 |
Electricity Demand | $102,177 | 6,221 |
kW-mo/yr
|
$16.42 |
Electricity Fees | $4,118 | - |
|
- |
Natural Gas | $49,650 | 8,003 |
MMBtu
|
$6.20 |
Fuel Oil #1 | $19,404 | 765 |
MMBtu
|
$25.37 |
TOTAL YEARLY COSTS | $301,174 | |||
RECOMMENDED SAVINGS* | $107,134 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $90,198 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $83,964 | $377,320 |
$15,859
426,766
kWh
|
$9,828
-
kW-mo/yr
|
- | - | - | $58,277 | |
02 | 2.3212: Optimize plant power factor | $5,049 | $6,500 | - | - | $5,049 | - | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $5,446 | $14,800 | - | - | - | - | $5,446 | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,107 | $1,876 |
$1,053
28,995
kWh
|
$54
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $788 | $3,863 |
$453
12,292
kWh
|
$335
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.8222: Size trucks to job | $10,780 | $56,000 | - | - | - |
$10,780
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $107,134 | $460,359 |
$17,365
468,053
kWh
|
$10,217
-
kW-mo/yr
|
$5,049 |
$10,780
-
MMBtu
|
$5,446 | $58,277 | ||
TOTAL IMPLEMENTED | $90,198 | $395,983 |
$16,312
439,058
kWh
|
$10,163
-
kW-mo/yr
|
- | - | $5,446 | $58,277 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #1 Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs