ITAC Assessment: UU0188
ITAC logo
ITAC Assessment: UU0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 237110: Water and Sewer Line and Related Structures Construction
SIC 1623: Water, Sewer, Pipeline, and Communications and Power Line Construction
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 522,729
ft2
Annual Production 924,371
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,825 3,465,000
kWh
Electricity Demand $102,177 6,221
kW-mo/yr
Electricity Fees $4,118 -
Natural Gas $49,650 8,003
MMBtu
Fuel Oil #1 $19,404 765
MMBtu
TOTAL YEARLY COSTS $301,174
RECOMMENDED SAVINGS* $107,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $90,198

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $83,964 $377,320 $15,859
426,766
kWh
$9,828
-
kW-mo/yr
- - - $58,277
02 2.3212: Optimize plant power factor $5,049 $6,500 - - $5,049 - - -
03 2.8114: Change rate schedules or other changes in utility service $5,446 $14,800 - - - - $5,446 -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,107 $1,876 $1,053
28,995
kWh
$54
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $788 $3,863 $453
12,292
kWh
$335
-
kW-mo/yr
- - - -
06 2.8222: Size trucks to job $10,780 $56,000 - - - $10,780
-
MMBtu
- -
TOTAL RECOMMENDED $107,134 $460,359 $17,365
468,053
kWh
$10,217
-
kW-mo/yr
$5,049 $10,780
-
MMBtu
$5,446 $58,277
TOTAL IMPLEMENTED $90,198 $395,983 $16,312
439,058
kWh
$10,163
-
kW-mo/yr
- - $5,446 $58,277
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #1 Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs