Assessment Year | 2021 |
---|---|
Principal Product | custom bulk explosive trucks |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
105,000
ft2
|
Annual Production | 50
units
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $22,675 | 623,400 |
kWh
|
$0.036 |
Electricity Demand | $42,118 | 2,537 |
kW-mo/yr
|
$16.60 |
Electricity Fees | $6,481 | - |
|
- |
Natural Gas | $44,109 | 4,875 |
MMBtu
|
$9.05 |
TOTAL YEARLY COSTS | $115,383 | |||
RECOMMENDED SAVINGS* | $18,411 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,683 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,919 | $19,705 |
$3,666
100,701
kWh
|
$6,253
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $3,932 | $15,000 |
$(-491.2)
13,494
kWh
|
$(-796.9)
-
kW-mo/yr
|
$5,220
-
MMBtu
|
|
03 | 2.6231: Utilize controls to operate equipment only when needed | $2,796 | $4,794 |
$211
5,793
kWh
|
- |
$2,585
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $822 | $1,645 |
$247
6,786
kWh
|
$575
-
kW-mo/yr
|
- | |
05 | 2.6218: Turn off equipment when not in use | $544 | $200 |
$544
14,951
kWh
|
- | - | |
06 | 2.7131: Add area lighting switches | $398 | $883 |
$398
10,927
kWh
|
- | - | |
TOTAL RECOMMENDED | $18,411 | $42,227 |
$4,574
152,651
kWh
|
$6,032
-
kW-mo/yr
|
$7,806
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,683 | $22,433 |
$4,854
133,364
kWh
|
$6,828
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs