ITAC Assessment: UU0186
ITAC logo
ITAC Assessment: UU0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product custom bulk explosive trucks
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 105,000
ft2
Annual Production 50
units
Production Hrs. Annual 2,625
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,675 623,400
kWh
Electricity Demand $42,118 2,537
kW-mo/yr
Electricity Fees $6,481 -
Natural Gas $44,109 4,875
MMBtu
TOTAL YEARLY COSTS $115,383
RECOMMENDED SAVINGS* $18,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,919 $19,705 $3,666
100,701
kWh
$6,253
-
kW-mo/yr
-
02 2.2437: Recover waste heat from equipment $3,932 $15,000 $(-491.2)
13,494
kWh
$(-796.9)
-
kW-mo/yr
$5,220
-
MMBtu
03 2.6231: Utilize controls to operate equipment only when needed $2,796 $4,794 $211
5,793
kWh
- $2,585
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $822 $1,645 $247
6,786
kWh
$575
-
kW-mo/yr
-
05 2.6218: Turn off equipment when not in use $544 $200 $544
14,951
kWh
- -
06 2.7131: Add area lighting switches $398 $883 $398
10,927
kWh
- -
TOTAL RECOMMENDED $18,411 $42,227 $4,574
152,651
kWh
$6,032
-
kW-mo/yr
$7,806
-
MMBtu
TOTAL IMPLEMENTED $11,683 $22,433 $4,854
133,364
kWh
$6,828
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs