ITAC Assessment: UU0178
ITAC logo
ITAC Assessment: UU0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Automotive Safety Products
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 275,000
ft2
Annual Production 32,500,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,847,489 40,873,664
kWh
Electricity Demand $664,110 77,583
kW-mo/yr
Electricity Fees $168,478 -
Natural Gas $31,445 7,487
MMBtu
Waste Disposal Costs
Water Usage $23,686 17,416
Tgal
TOTAL YEARLY COSTS $2,735,209
RECOMMENDED SAVINGS* $170,253 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $30,811 $1,300 $23,635
522,898
kWh
$7,176
-
kW-mo/yr
- -
02 2.2511: Insulate bare equipment $8,654 $3,913 $6,468
143,101
kWh
$1,674
-
kW-mo/yr
$512
-
MMBtu
-
03 2.2511: Insulate bare equipment $4,347 $9,400 $3,187
70,500
kWh
$1,161
-
kW-mo/yr
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $99,244 $320,000 $104,910
2,321,021
kWh
$35,912
-
kW-mo/yr
$(-41,578.0)
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,197 $9,700 $1,685
37,279
kWh
$512
-
kW-mo/yr
- -
06 2.8124: Hire energy manager $25,000 $7,800 - - - $25,000
TOTAL RECOMMENDED $170,253 $352,113 $139,885
3,094,799
kWh
$46,435
-
kW-mo/yr
$(-41,066.0)
-
MMBtu
$25,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs