ITAC Assessment: UU0173
ITAC logo
ITAC Assessment: UU0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Cast Parts
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 57,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,295
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,355 1,138,392
kWh
Electricity Demand $181,633 13,268
kW-mo/yr
Electricity Fees $586 -
Natural Gas $10,074 1,012
MMBtu
Waste Disposal Costs
Water Usage $1,462 603
Tgal
TOTAL YEARLY COSTS $246,110
RECOMMENDED SAVINGS* $29,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,037 $2,000 - $15,037
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $5,743 $3,188 $5,743
124,885
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,755 $8,095 $1,456
31,652
kWh
$2,299
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $1,355 $594 $688
14,973
kWh
$667
-
kW-mo/yr
-
05 2.1133: Adjust burners for efficient operation $1,292 $1,300 - - $1,292
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,018 $474 $851
18,500
kWh
$167
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $683 $2,361 $683
14,847
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $661 $600 $336
7,310
kWh
$325
-
kW-mo/yr
-
TOTAL RECOMMENDED $29,543 $18,612 $9,757
212,167
kWh
$18,495
-
kW-mo/yr
$1,292
-
MMBtu
TOTAL IMPLEMENTED $10,516 $11,757 $8,050
175,037
kWh
$2,466
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs