Assessment Year | 2021 |
---|---|
Principal Product | Metal Cast Parts |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
57,000
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 2,295
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $52,355 | 1,138,392 |
kWh
|
$0.046 | |
Electricity Demand | $181,633 | 13,268 |
kW-mo/yr
|
$13.69 | |
Electricity Fees | $586 | - |
|
- | |
Natural Gas | $10,074 | 1,012 |
MMBtu
|
$9.95 | |
Waste Disposal Costs | |||||
Water Usage | $1,462 | 603 |
Tgal
|
$2.42 | |
TOTAL YEARLY COSTS | $246,110 | ||||
RECOMMENDED SAVINGS* | $29,543 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $10,516 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,037 | $2,000 | - |
$15,037
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $5,743 | $3,188 |
$5,743
124,885
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,755 | $8,095 |
$1,456
31,652
kWh
|
$2,299
-
kW-mo/yr
|
- | |
04 | 2.2511: Insulate bare equipment | $1,355 | $594 |
$688
14,973
kWh
|
$667
-
kW-mo/yr
|
- | |
05 | 2.1133: Adjust burners for efficient operation | $1,292 | $1,300 | - | - |
$1,292
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,018 | $474 |
$851
18,500
kWh
|
$167
-
kW-mo/yr
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $683 | $2,361 |
$683
14,847
kWh
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $661 | $600 |
$336
7,310
kWh
|
$325
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $29,543 | $18,612 |
$9,757
212,167
kWh
|
$18,495
-
kW-mo/yr
|
$1,292
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,516 | $11,757 |
$8,050
175,037
kWh
|
$2,466
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs