Assessment Year | 2020 |
---|---|
Principal Product | Automotive Safety products |
NAICS | 336390: Other Motor Vehicle Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | greater than $500 M |
# of Employees | 1,800 |
Plant Area |
350,000
ft2
|
Annual Production | 37,440,000
units
|
Production Hrs. Annual | 6,720
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $574,475 | 17,304,137 |
kWh
|
$0.033 | |
Electricity Demand | $490,599 | 35,179 |
kW-mo/yr
|
$13.95 | |
Electricity Fees | $97,643 | - |
|
- | |
Natural Gas | $48,749 | 15,638 |
MMBtu
|
$3.12 | |
Waste Disposal Costs | |||||
Water Usage | $71,642 | 13,359 |
Tgal
|
$5.36 | |
TOTAL YEARLY COSTS | $1,283,108 | ||||
RECOMMENDED SAVINGS* | $37,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $34,890 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $18,825 | $21,841 |
$11,923
361,317
kWh
|
$6,902
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $13,868 | $2,000 |
$13,868
420,240
kWh
|
- | - | |
03 | 2.6124: Establish equipment maintenance schedule | $1,681 | $1,200 |
$891
26,999
kWh
|
$790
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,521 | $150 |
$868
26,290
kWh
|
$653
-
kW-mo/yr
|
- | |
05 | 2.2511: Insulate bare equipment | $1,259 | $1,259 |
$718
21,746
kWh
|
$542
-
kW-mo/yr
|
- | |
06 | 2.2511: Insulate bare equipment | $676 | $440 | - | - |
$676
-
MMBtu
|
|
TOTAL RECOMMENDED | $37,830 | $26,890 |
$28,268
856,592
kWh
|
$8,887
-
kW-mo/yr
|
$676
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,890 | $24,431 |
$26,659
807,847
kWh
|
$7,555
-
kW-mo/yr
|
$676
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs