ITAC Assessment: UU0170
ITAC logo
ITAC Assessment: UU0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Automotive Safety products
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range greater than $500
M
# of Employees 1,800
Plant Area 350,000
ft2
Annual Production 37,440,000
units
Production Hrs. Annual 6,720
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $574,475 17,304,137
kWh
Electricity Demand $490,599 35,179
kW-mo/yr
Electricity Fees $97,643 -
Natural Gas $48,749 15,638
MMBtu
Waste Disposal Costs
Water Usage $71,642 13,359
Tgal
TOTAL YEARLY COSTS $1,283,108
RECOMMENDED SAVINGS* $37,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,890

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $18,825 $21,841 $11,923
361,317
kWh
$6,902
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $13,868 $2,000 $13,868
420,240
kWh
- -
03 2.6124: Establish equipment maintenance schedule $1,681 $1,200 $891
26,999
kWh
$790
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,521 $150 $868
26,290
kWh
$653
-
kW-mo/yr
-
05 2.2511: Insulate bare equipment $1,259 $1,259 $718
21,746
kWh
$542
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $676 $440 - - $676
-
MMBtu
TOTAL RECOMMENDED $37,830 $26,890 $28,268
856,592
kWh
$8,887
-
kW-mo/yr
$676
-
MMBtu
TOTAL IMPLEMENTED $34,890 $24,431 $26,659
807,847
kWh
$7,555
-
kW-mo/yr
$676
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs