ITAC Assessment: UU0161
ITAC logo
ITAC Assessment: UU0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Ice cream and novelties
NAICS 311520: Ice Cream and Frozen Dessert Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 141,912
ft2
Annual Production 10,500,000
pieces
Production Hrs. Annual 8,720
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,056,233 32,117,120
kWh
Electricity Demand $833,677 61,345
kW-mo/yr
Electricity Fees $150,865 -
Natural Gas $270,305 74,100
MMBtu
Waste Disposal Costs
Water Usage $56,754 37,806
Tgal
Water Disposal $150,846 37,806
Tgal
Other Liquid (haz) $825,305 87,413,496
gal
TOTAL YEARLY COSTS $3,343,985
RECOMMENDED SAVINGS* $84,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $76,195

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 3.4131: Minimize contamination of water before treatment $43,260 $86,000 - - - - $43,260
02 2.7496: Install partitions to reduce size of conditioned space $22,840 $53,000 $4,840
146,640
kWh
- - $18,000 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $8,315 $7,880 $8,585
260,170
kWh
- - $(-270.0) -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,370 $5,370 $3,150
95,420
kWh
$2,220
-
kW-mo/yr
- - -
05 2.2522: Isolate hot or cold equipment $2,460 $9,000 $(-1,670.0)
(-50,460)
kWh
$(-940.0)
-
kW-mo/yr
$5,070
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,780 $6,880 $1,130
34,430
kWh
$650
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $84,025 $168,130 $16,035
486,200
kWh
$1,930
-
kW-mo/yr
$5,070
-
MMBtu
$17,730 $43,260
TOTAL IMPLEMENTED $76,195 $153,760 $14,555
441,240
kWh
$650
-
kW-mo/yr
- $17,730 $43,260
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs