ITAC Assessment: UU0151
ITAC logo
ITAC Assessment: UU0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Cheese and Yogurt
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 800,000
ft2
Annual Production 165,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $846,705 23,261,122
kWh
Electricity Demand $639,314 37,919
kW-mo/yr
Electricity Fees $107,517 -
Natural Gas $467,099 122,286
MMBtu
TOTAL YEARLY COSTS $2,060,635
RECOMMENDED SAVINGS* $107,942 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1212: Operate boilers on high fire setting $63,057 $1,000 - - - $63,057
-
MMBtu
02 2.3212: Optimize plant power factor $17,315 $25,000 - - $17,315 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,711 $37,970 $6,446
177,080
kWh
$4,265
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,969 $1,000 $3,632
100,901
kWh
$2,337
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,157 $1,000 $4,355
120,970
kWh
$2,802
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $1,973 $7,800 $1,973
54,800
kWh
- - -
07 2.3132: Recharge batteries on during off-peak demand periods $1,760 $100 - $1,760
-
kW-mo/yr
- -
TOTAL RECOMMENDED $107,942 $73,870 $16,406
453,751
kWh
$11,163
-
kW-mo/yr
$17,315 $63,057
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs