ITAC Assessment: UU0143
ITAC logo
ITAC Assessment: UU0143
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,000
ft2
Annual Production 14,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,027 223,709
kWh
Electricity Demand $11,766 801
kW-mo/yr
Natural Gas $21,469 2,855
MMBtu
Waste Disposal Costs
Water Usage $97,738 2,605
Tgal
TOTAL YEARLY COSTS $145,000
RECOMMENDED SAVINGS* $17,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,221

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $485 $100 $118
3,149
kWh
$367
-
kW-mo/yr
- - -
02 2.8114: Change rate schedules or other changes in utility service $3,516 $3,140 - - - $3,516 -
03 2.8114: Change rate schedules or other changes in utility service $510 $50 - - $510 - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,501 $3,184 - - - $1,501 -
05 3.4151: Minimize water usage $11,728 $50,000 - - - - $11,728
-
Tgal
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $220 $275 $220
6,043
kWh
- - - -
TOTAL RECOMMENDED $17,960 $56,749 $338
9,192
kWh
$367
-
kW-mo/yr
$510 $5,017 $11,728
-
Tgal
TOTAL IMPLEMENTED $4,221 $3,515 $338
9,192
kWh
$367
-
kW-mo/yr
- $3,516 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs