ITAC Assessment: UU0136
ITAC logo
ITAC Assessment: UU0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Advanced Composite Scructures
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 100,000
ft2
Annual Production 25,000
units
Production Hrs. Annual 6,864
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,012 3,477,660
kWh
Electricity Demand $85,747 13,113
kW-mo/yr
Electricity Fees $32,055 -
Natural Gas $19,557 2,690
MMBtu
TOTAL YEARLY COSTS $365,371
RECOMMENDED SAVINGS* $207,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $159,197 $1,737,000 $199,251
3,037,367
kWh
$94,176
-
kW-mo/yr
$(-100,534.0)
-
MMBtu
$(-33,696.0) -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $17,936 $17,716 $15,453
234,134
kWh
$2,488
-
kW-mo/yr
- $(-5.0) -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,124 - - $14,124
-
kW-mo/yr
- - -
04 2.7144: Install spectral reflectors / delamp $5,731 $1,000 $5,319
80,592
kWh
$722
-
kW-mo/yr
- $(-310.0) -
05 2.7134: Use photocell controls $4,948 $420 $4,246
64,333
kWh
$866
-
kW-mo/yr
- $(-164.0) -
06 2.6218: Turn off equipment when not in use $2,075 - $2,075
31,450
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,814 $600 $1,524
23,088
kWh
$290
-
kW-mo/yr
- - -
08 2.8121: Apply for tax-free status for energy purchases $1,192 $1,000 - - - - $1,192
TOTAL RECOMMENDED $207,017 $1,757,736 $227,868
3,470,964
kWh
$112,666
-
kW-mo/yr
$(-100,534.0)
-
MMBtu
$(-34,175.0) $1,192
TOTAL IMPLEMENTED $26,773 $18,736 $23,298
353,005
kWh
$3,644
-
kW-mo/yr
- $(-169.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs