ITAC Assessment: UU0129
ITAC logo
ITAC Assessment: UU0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Aircraft parts and assemblies
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 300
Plant Area 130,000
ft2
Annual Production 750
units
Production Hrs. Annual 3,840
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,534 1,152,651
kWh
Electricity Demand $74,999 4,363
kW-mo/yr
Waste Disposal Costs
Solid Waste (non-haz) $6,175 10,863
lb
TOTAL YEARLY COSTS $123,708
RECOMMENDED SAVINGS* $37,405 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $13,622 - - $13,622
-
kW-mo/yr
- - - -
02 2.5195: Change product design to reduce energy requirements $9,283 $120 - $9,283
-
kW-mo/yr
- - - -
03 2.8121: Apply for tax-free status for energy purchases $7,783 $500 - - $7,783 - - -
04 3.5241: Sell used plates to an aluminum recycler $5,775 - - - - $6,175
-
lb
- $(-400.0)
05 2.6125: Keep equipment clean $942 $80 $274
7,200
kWh
$1,196
-
kW-mo/yr
- - $(-528.0) -
TOTAL RECOMMENDED $37,405 $700 $274
7,200
kWh
$24,101
-
kW-mo/yr
$7,783 $6,175
-
lb
$(-528.0) $(-400.0)
TOTAL IMPLEMENTED $37,405 $700 $274
7,200
kWh
$24,101
-
kW-mo/yr
$7,783 $6,175
-
lb
$(-528.0) $(-400.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs