ITAC Assessment: UU0121
ITAC logo
ITAC Assessment: UU0121
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product X-Ray tube, polarizers
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 54,000
ft2
Annual Production 25,000
pieces
Production Hrs. Annual 6,280
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,098 10,323,589
kWh
Electricity Demand $228,922 18,326
kW-mo/yr
Electricity Fees $74,029 -
Natural Gas $37,487 5,307
MMBtu
Waste Disposal Costs
Water Usage $25,695 27,457
Tgal
TOTAL YEARLY COSTS $753,231
RECOMMENDED SAVINGS* $78,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $52,997 $500 - - $52,997 -
02 2.8113: Purchase gas directly from a contract gas supplier $14,820 - - - - $14,820
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,132 $10,133 $2,931
78,191
kWh
$3,930
-
kW-mo/yr
$1,272 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,280 $1,967 $1,136
30,301
kWh
$864
-
kW-mo/yr
$279 -
TOTAL RECOMMENDED $78,229 $12,600 $4,067
108,492
kWh
$4,794
-
kW-mo/yr
$54,548 $14,820
TOTAL IMPLEMENTED $63,409 $12,600 $4,067
108,492
kWh
$4,794
-
kW-mo/yr
$54,548 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs