ITAC Assessment: UU0118
ITAC logo
ITAC Assessment: UU0118
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Medical Devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 137,945
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,730
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,833 2,581,800
kWh
Electricity Demand $69,841 5,530
kW-mo/yr
Electricity Fees $37,920 -
Natural Gas $77,639 12,126
MMBtu
TOTAL YEARLY COSTS $280,232
RECOMMENDED SAVINGS* $24,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,381

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $13,592 $500 - - $13,592
02 2.2211: Use optimum temperature $7,381 - $3,992
108,798
kWh
$2,566
-
kW-mo/yr
$823
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,762 - $1,703
46,371
kWh
$802
-
kW-mo/yr
$257
04 2.7144: Install spectral reflectors / delamp $361 $113 $226
6,161
kWh
$28
-
kW-mo/yr
$107
TOTAL RECOMMENDED $24,096 $613 $5,922
161,330
kWh
$3,396
-
kW-mo/yr
$14,778
TOTAL IMPLEMENTED $7,381 - $3,992
108,798
kWh
$2,566
-
kW-mo/yr
$823
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs