Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product construction machinery
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 709
Plant Area 271,176
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,731 4,815,840
kWh
Electricity Demand $142,776 12,968
kW-mo/yr
Natural Gas $124,722 19,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,970 $3,720 - $3,970
-
kW-mo/yr
-
02 2.3191: Use demand controller or load shedder $28,070 $10,000 - $28,070
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,560 $2,670 $7,670
255,910
kWh
$6,890
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $2,120 $4,365 - - $2,120
-
MMBtu
05 2.4112: Install soft-start to eliminate nuisance trips $9,940 $30,000 $890
29,848
kWh
$9,050
-
kW-mo/yr
-
TOTAL RECOMMENDED $58,660 $50,755 $8,560
285,758
kWh
$47,980
-
kW-mo/yr
$2,120
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs