ITAC Assessment: UU0107
ITAC logo
ITAC Assessment: UU0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Food Processing Equipment
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $5
M
to 10
M
# of Employees 56
Plant Area 66,000
ft2
Annual Production 50
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,427 327,360
kWh
Electricity Demand $17,269 1,594
kW-mo/yr
Natural Gas $34,051 3,604
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $520 $435 $520
18,330
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $950 $18 $360
12,970
kWh
$590
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,590 $2,085 $850
30,380
kWh
$1,740
-
kW-mo/yr
-
04 2.1224: Replace boiler $1,090 $800 $(-20.0)
(-850)
kWh
$(-220.0)
-
kW-mo/yr
$1,330
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $1,470 $8,820 $440
15,590
kWh
- $1,030
-
MMBtu
06 2.3212: Optimize plant power factor $1,690 $1,860 - $1,690
-
kW-mo/yr
-
TOTAL RECOMMENDED $8,310 $14,018 $2,150
76,420
kWh
$3,800
-
kW-mo/yr
$2,360
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs