Assessment Year | 2006 |
---|---|
Principal Product | Aircraft Parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
80,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $169,017 | 6,857,400 |
kWh
|
$0.025 |
Electricity Demand | $210,741 | 18,908 |
kW-mo/yr
|
$11.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $19,900 | $40,020 | - |
$19,900
-
kW-mo/yr
|
- | |
02 | 2.3191: Use demand controller or load shedder | $43,630 | $20,000 | - |
$43,630
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,510 | $3,780 |
$4,830
174,480
kWh
|
$3,680
-
kW-mo/yr
|
- | |
04 | 2.4239: Eliminate or reduce compressed air usage | $6,120 | $4,000 |
$3,230
116,840
kWh
|
$2,890
-
kW-mo/yr
|
- | |
05 | 3.4114: Replace city water with recycled water via cooling tower | $23,010 | $7,390 |
$(-330.0)
(-11,910)
kWh
|
$(-210.0)
-
kW-mo/yr
|
$23,550
-
Tgal
|
|
06 | 2.7124: Make a practice of turning off lights when not needed | $590 | $500 |
$360
13,140
kWh
|
$230
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $101,760 | $75,690 |
$8,090
292,550
kWh
|
$70,120
-
kW-mo/yr
|
$23,550
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs