ITAC Assessment: UU0096
ITAC logo
ITAC Assessment: UU0096
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Composite Materials
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 70,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,184
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,762 397,560
kWh
Electricity Demand $23,255 2,307
kW-mo/yr
Natural Gas $12,983 1,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $840 $330 $280
9,940
kWh
$560
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,320 $5,000 $1,100
39,100
kWh
$2,220
-
kW-mo/yr
- -
03 2.7134: Use photocell controls $2,530 $2,040 $470
16,640
kWh
$2,060
-
kW-mo/yr
- -
04 2.2437: Recover waste heat from equipment $3,320 $1,950 - - $3,320
-
MMBtu
-
05 3.5311: Recover and reuse waste material $9,000 - - - - $9,000
TOTAL RECOMMENDED $19,010 $9,320 $1,850
65,680
kWh
$4,840
-
kW-mo/yr
$3,320
-
MMBtu
$9,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs