Assessment Year | 2005 |
---|---|
Principal Product | Medical devices |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
90,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 4,225
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,262 | 1,848,160 |
kWh
|
$0.028 |
Electricity Demand | $47,550 | 5,092 |
kW-mo/yr
|
$9.34 |
Natural Gas | $21,002 | 3,602 |
MMBtu
|
$5.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,878 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,643 | $6,171 |
$720
23,755
kWh
|
$923
-
kW-mo/yr
|
- | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $697 | $2,150 |
$367
12,144
kWh
|
$330
-
kW-mo/yr
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,537 | - |
$458
15,135
kWh
|
$1,079
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $506 | $235 |
$506
16,712
kWh
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $491 | $200 |
$491
16,217
kWh
|
- | - | |
06 | 2.3212: Optimize plant power factor | $4,429 | $5,220 | - |
$4,429
-
kW-mo/yr
|
- | |
07 | 2.8112: Combine utility meters | $575 | $315 | - | - | $575 | |
TOTAL RECOMMENDED | $9,878 | $14,291 |
$2,542
83,963
kWh
|
$6,761
-
kW-mo/yr
|
$575 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs