ITAC Assessment: UU0082
ITAC logo
ITAC Assessment: UU0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Air bags
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 410,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,100 2,592,000
kWh
Electricity Demand $314,196 12,064
kW-mo/yr
Natural Gas $788,000 134,861
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2112: Use correct size steam traps $32,790 $20,000 - - $7,590
-
MMBtu
$25,200
02 2.2114: Shut off steam traps on super heated steam lines when not in use $36,280 - - - $53,470
-
MMBtu
$(-17,190.0)
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $784 $4,300 $274
12,300
kWh
$510
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $786 $600 $532
23,800
kWh
$254
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,720 $540 $16,140
697,900
kWh
$3,580
-
kW-mo/yr
- -
TOTAL RECOMMENDED $90,360 $25,440 $16,946
734,000
kWh
$4,344
-
kW-mo/yr
$61,060
-
MMBtu
$8,010
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs