ITAC Assessment: UU0077
ITAC logo
ITAC Assessment: UU0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product snack food
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 250,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,776
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,385 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $12,125 $2,670 - - $12,125
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,520 $5,000 $5,060
156,660
kWh
$2,460
-
kW-mo/yr
- -
03 2.2424: Use heat in flue gases to preheat products or materials $14,890 $45,000 - - $14,890
-
MMBtu
-
04 3.3111: Adjust ph for neutralization $12,850 $45,920 - - - $12,850
TOTAL RECOMMENDED $47,385 $98,590 $5,060
156,660
kWh
$2,460
-
kW-mo/yr
$27,015
-
MMBtu
$12,850
TOTAL IMPLEMENTED $22,410 $50,000 $5,060
156,660
kWh
$2,460
-
kW-mo/yr
$14,890
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs