ITAC Assessment: UU0076
ITAC logo
ITAC Assessment: UU0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product beverages
NAICS 311119: Other Animal Food Manufacturing
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area
n/a
Annual Production 20,000
bbl
Production Hrs. Annual 2,040
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,805 413,810
kWh
Electricity Demand $14,470 1,669
kW-mo/yr
Natural Gas $20,920 4,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,600 $2,000 - - $1,600
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $24 $40 $24
730
kWh
- - -
03 2.2628: Utilize a less expensive cooling method $30 - $20
520
kWh
$10
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,300 $4,824 $790
26,220
kWh
$1,510
-
kW-mo/yr
- -
05 3.4155: Meter waste water $5,360 $1,500 - - - $5,360
-
Tgal
06 2.3212: Optimize plant power factor $1,982 $2,220 - $1,982
-
kW-mo/yr
- -
TOTAL RECOMMENDED $11,296 $10,584 $834
27,470
kWh
$3,502
-
kW-mo/yr
$1,600
-
MMBtu
$5,360
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs