ITAC Assessment: UU0069
ITAC logo
ITAC Assessment: UU0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product disposable diapers
NAICS 322291: Sanitary Paper Product Manufacturing
SIC 2676: Sanitary Paper Products
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 150,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,329,049 62,458,242
kWh
Electricity Demand $616,492 101,205
kW-mo/yr
Electricity Fees $68,490 -
Natural Gas $363,950 62,077
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $225,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,481

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $1,879 $11,735 $1,275
58,258
kWh
$604
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,497 $268 $3,054
139,449
kWh
$1,443
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $16,545 $2,000 - - $16,545
-
MMBtu
-
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $91,960 $12,500 - - $91,960
-
MMBtu
-
05 2.8114: Change rate schedules or other changes in utility service $34,560 - - - $34,560
-
MMBtu
-
06 3.1161: Eliminate/reduce an operation $76,000 $180,000 - - - $76,000
-
gal
TOTAL RECOMMENDED $225,441 $206,503 $4,329
197,707
kWh
$2,047
-
kW-mo/yr
$143,065
-
MMBtu
$76,000
-
gal
TOTAL IMPLEMENTED $57,481 $14,003 $4,329
197,707
kWh
$2,047
-
kW-mo/yr
$51,105
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs