ITAC Assessment: UU0065
ITAC logo
ITAC Assessment: UU0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product climbing equipment
NAICS 339920: Sporting and Athletic Goods Manufacturing
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 96,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,290
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,345 1,815,080
kWh
Electricity Demand $53,258 6,575
kW-mo/yr
Electricity Fees $9,566 -
Natural Gas $6,625 1,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $4,060 $5,520 - - $4,060
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,450 - - $6,450
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,345 $1,100 $690
24,000
kWh
$655
-
kW-mo/yr
-
04 2.7144: Install spectral reflectors / delamp $1,188 $225 $602
21,000
kWh
$586
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $1,650 $675 $1,650
57,600
kWh
- -
TOTAL RECOMMENDED $14,693 $7,520 $2,942
102,600
kWh
$7,691
-
kW-mo/yr
$4,060
TOTAL IMPLEMENTED $8,983 $1,325 $1,292
45,000
kWh
$7,691
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs