ITAC Assessment: UU0059
ITAC logo
ITAC Assessment: UU0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product airbag inflators
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 750
Plant Area 586,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,017,508 32,929,066
kWh
Electricity Demand $349,694 59,543
kW-mo/yr
Electricity Fees $21,108 -
Natural Gas $45,856 9,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.4221: Install compressor air intakes in coolest locations $12,130 $9,651 $9,299
297,500
kWh
$2,831
-
kW-mo/yr
- -
02 2.4239: Eliminate or reduce compressed air usage $20,658 $20,658 $15,838
505,000
kWh
$4,820
-
kW-mo/yr
- -
03 2.4131: Size electric motors for peak operating efficiency $23,500 $15,630 $17,739
565,600
kWh
$5,761
-
kW-mo/yr
- -
04 2.2449: Recover heat from exhausted steam, hot air or hot water $6,386 $275 - - $4,656
-
MMBtu
$1,730
-
Tgal
05 2.7144: Install spectral reflectors / delamp $29,485 $6,260 $22,633
721,600
kWh
$6,852
-
kW-mo/yr
- -
06 2.7145: Install skylights $32,748 $272,000 $32,618
1,040,000
kWh
- $130
-
MMBtu
-
07 2.2521: Isolate steam lines to avoid heating air conditioned areas $12,192 $8,860 $10,050
320,500
kWh
$2,142
-
kW-mo/yr
- -
TOTAL RECOMMENDED $137,099 $333,334 $108,177
3,450,200
kWh
$22,406
-
kW-mo/yr
$4,786
-
MMBtu
$1,730
-
Tgal
TOTAL IMPLEMENTED $50,143 $26,918 $38,471
1,226,600
kWh
$11,672
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs