ITAC Assessment: UU0012
ITAC logo
ITAC Assessment: UU0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Gilsonite
NAICS
n/a
SIC 2893: Printing Ink
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 15,000
ft2
Annual Production 25,000
ton
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $409,092 13,028,400
kWh
Electricity Demand $382,936 34,812
kW-mo/yr
Electricity Fees $26,376 -
Natural Gas $676,288 138,069
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,600

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $23,054 $55,276 $15,524
494,416
kWh
$7,530
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $8,209 $250 $3,959
126,100
kWh
$4,250
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $8,154 $7,500 - - $8,154
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,600 $5,000 - $6,600
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,019 $1,000 $1,231
39,210
kWh
$788
-
kW-mo/yr
-
TOTAL RECOMMENDED $48,036 $69,026 $20,714
659,726
kWh
$19,168
-
kW-mo/yr
$8,154
-
MMBtu
TOTAL IMPLEMENTED $6,600 $5,000 - $6,600
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs