ITAC Assessment: UU0011
ITAC logo
ITAC Assessment: UU0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product phosphate slurry
NAICS
n/a
SIC 2875: Fertilizers, Mixing Only
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 15,000
ft2
Annual Production 2,500,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,706,262 84,620,000
kWh
Electricity Demand $822,034 143,700
kW-mo/yr
Electricity Fees $60,313 -
Natural Gas $109,427 21,612
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,146

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $55,587 $47,184 $43,056
1,971,679
kWh
$12,531
-
kW-mo/yr
02 2.4314: Use synthetic lubricant $44,401 $4,000 $34,386
1,577,340
kWh
$10,015
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $24,413 $85,168 $18,899
865,519
kWh
$5,514
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $964 $3,417 $695
31,798
kWh
$269
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $745 $140 $537
24,594
kWh
$208
-
kW-mo/yr
TOTAL RECOMMENDED $126,110 $139,909 $97,573
4,470,930
kWh
$28,537
-
kW-mo/yr
TOTAL IMPLEMENTED $125,146 $136,492 $96,878
4,439,132
kWh
$28,268
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs