ITAC Assessment: UU0007
ITAC logo
ITAC Assessment: UU0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Chemical Analyses
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 38,000
ft2
Annual Production 94,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,921 2,244,480
kWh
Electricity Demand $37,912 4,584
kW-mo/yr
Electricity Fees $6,319 -
Natural Gas $45,540 7,642
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,319 $5,852 n/a $1,450
47,824
kWh
$869
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $3,545 $7,155 n/a - $3,545
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $430 $430 $310
10,100
kWh
$120
-
kW-mo/yr
-
04 2.4314: Use synthetic lubricant $564 $400 $434
14,353
kWh
$130
-
kW-mo/yr
-
05 3.4115: Recover and reuse cooling water $953 $20 - - $953
-
gal
TOTAL RECOMMENDED $7,811 $13,857 $2,194
72,277
kWh
$4,664
-
kW-mo/yr
$953
-
gal
TOTAL IMPLEMENTED $430 $430 $310
10,100
kWh
$120
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs