ITAC Assessment: MI0379
ITAC logo
ITAC Assessment: MI0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Biochemicals
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 46,000
ft2
Annual Production 766,652
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $692,599 4,065,120
kWh
Electricity Demand $67,307 8,067
kW-mo/yr
Electricity Fees $6,746 -
LPG $20 1
MMBtu
Waste Disposal Costs
Water Usage $33,916 1,658
Tgal
Water Disposal $12,835 1,658
Tgal
TOTAL YEARLY COSTS $813,423
RECOMMENDED SAVINGS* $222,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $192,230

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings
01 2.2622: Replace existing chiller with high efficiency model $192,230 $217,000 $178,214
1,048,320
kWh
$14,016
-
kW-mo/yr
- -
02 3.4116: Meter recycled water (to reduce sewer charges) $11,551 $2,080 - - - $11,551
-
Tgal
03 2.9112: Use solar heat to heat water $9,075 $12,000 $7,440
43,767
kWh
$1,635
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,846 $1,980 $4,537
26,685
kWh
$309
-
kW-mo/yr
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,953 $5,914 $4,004
23,550
kWh
$1,572
-
kW-mo/yr
$(-1,623.0)
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,317 $2,100 $1,234
7,256
kWh
$83
-
kW-mo/yr
- -
TOTAL RECOMMENDED $222,972 $241,074 $195,429
1,149,578
kWh
$17,615
-
kW-mo/yr
$(-1,623.0)
-
MMBtu
$11,551
-
Tgal
TOTAL IMPLEMENTED $192,230 $217,000 $178,214
1,048,320
kWh
$14,016
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs