Assessment Year | 2021 |
---|---|
Principal Product | Biochemicals |
NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
SIC | 3826: Laboratory Analytical Instruments |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
46,000
ft2
|
Annual Production | 766,652
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $692,599 | 4,065,120 |
kWh
|
$0.17 | |
Electricity Demand | $67,307 | 8,067 |
kW-mo/yr
|
$8.34 | |
Electricity Fees | $6,746 | - |
|
- | |
LPG | $20 | 1 |
MMBtu
|
$20.21 | |
Waste Disposal Costs | |||||
Water Usage | $33,916 | 1,658 |
Tgal
|
$20.46 | |
Water Disposal | $12,835 | 1,658 |
Tgal
|
$7.74 | |
TOTAL YEARLY COSTS | $813,423 | ||||
RECOMMENDED SAVINGS* | $222,972 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $192,230 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $192,230 | $217,000 |
$178,214
1,048,320
kWh
|
$14,016
-
kW-mo/yr
|
- | - | |
02 | 3.4116: Meter recycled water (to reduce sewer charges) | $11,551 | $2,080 | - | - | - |
$11,551
-
Tgal
|
|
03 | 2.9112: Use solar heat to heat water | $9,075 | $12,000 |
$7,440
43,767
kWh
|
$1,635
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,846 | $1,980 |
$4,537
26,685
kWh
|
$309
-
kW-mo/yr
|
- | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,953 | $5,914 |
$4,004
23,550
kWh
|
$1,572
-
kW-mo/yr
|
$(-1,623.0)
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,317 | $2,100 |
$1,234
7,256
kWh
|
$83
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $222,972 | $241,074 |
$195,429
1,149,578
kWh
|
$17,615
-
kW-mo/yr
|
$(-1,623.0)
-
MMBtu
|
$11,551
-
Tgal
|
||
TOTAL IMPLEMENTED | $192,230 | $217,000 |
$178,214
1,048,320
kWh
|
$14,016
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs