ITAC Assessment: UU0005
ITAC logo
ITAC Assessment: UU0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Trailer manufacturer
NAICS
n/a
SIC 3440:
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 117,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,735 2,962,000
kWh
Electricity Demand $63,439 8,088
kW-mo/yr
Electricity Fees $1,009 -
Natural Gas $41,292 7,588
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,826 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,950 $280 $5,416
190,045
kWh
$2,534
-
kW-mo/yr
02 2.3212: Optimize plant power factor $798 $932 - $798
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $2,396 $300 $1,614
63,356
kWh
$782
-
kW-mo/yr
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,070 $10,000 $2,070
72,634
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $612 $1,575 $418
29,308
kWh
$194
-
kW-mo/yr
TOTAL RECOMMENDED $13,826 $13,087 $9,518
355,343
kWh
$4,308
-
kW-mo/yr
TOTAL IMPLEMENTED $8,748 $1,212 $5,416
190,045
kWh
$3,332
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs