ITAC Assessment: UU0003
ITAC logo
ITAC Assessment: UU0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Plastic & metal plumbing products
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 35,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,761 6,116,400
kWh
Electricity Demand $101,781 1,106
kW-mo/yr
Electricity Fees $20,126 -
Natural Gas $20,274 2,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,867 $140 $2,447
80,985
kWh
$1,420
-
kW-mo/yr
02 2.3212: Optimize plant power factor $2,062 $4,761 - $2,062
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $9,150 $18,860 $7,040
233,000
kWh
$2,110
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $21,239 $13,990 $15,175
502,200
kWh
$6,064
-
kW-mo/yr
TOTAL RECOMMENDED $36,318 $37,751 $24,662
816,185
kWh
$11,656
-
kW-mo/yr
TOTAL IMPLEMENTED $5,929 $4,901 $2,447
80,985
kWh
$3,482
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs