ITAC Assessment: UU0002
ITAC logo
ITAC Assessment: UU0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Metal Foundry
NAICS
n/a
SIC 3320:
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 25,000
ft2
Annual Production 3,500
ton
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,859 2,403,470
kWh
Electricity Demand $30,784 22,282
kW-mo/yr
Electricity Fees $10,594 -
Natural Gas $96,880 23,926
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,007 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,263 $700 $2,347
54,238
kWh
$916
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $1,384 $950 - - $1,384
-
MMBtu
-
03 2.4133: Use most efficient type of electric motors $1,066 $1,066 $768
33,178
kWh
$298
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $254 $1,097 $108
4,650
kWh
$146
-
kW-mo/yr
- -
05 4.821: Pay bills on time to avoid late fees $1,040 - - - - $1,040
TOTAL RECOMMENDED $7,007 $3,813 $3,223
92,066
kWh
$1,360
-
kW-mo/yr
$1,384
-
MMBtu
$1,040
TOTAL IMPLEMENTED $4,557 $1,797 $2,455
58,888
kWh
$1,062
-
kW-mo/yr
- $1,040
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs