ITAC Assessment: NC0413
ITAC logo
ITAC Assessment: NC0413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Saft drinks and bottled water
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 90,000
ft2
Annual Production 18,200,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,922 4,446,240
kWh
Electricity Demand $144,359 10,282
kW-mo/yr
Electricity Fees $21,448 -
Natural Gas $179,227 19,670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,881 $100 $2,389
66,424
kWh
$1,332
-
kW-mo/yr
- $(-600.0) $(-240.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,796 $50 $2,437
67,769
kWh
$1,359
-
kW-mo/yr
- - -
03 2.2123: Insulate feedwater tank $283 $337 - - $283
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,066 $1,000 - - $1,066
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $67,233 $190,000 $(-9,137.0)
(-254,100)
kWh
$(-8,563.0)
-
kW-mo/yr
$84,933
-
MMBtu
- -
TOTAL RECOMMENDED $75,259 $191,487 $(-4,311.0)
(-119,907)
kWh
$(-5,872.0)
-
kW-mo/yr
$86,282
-
MMBtu
$(-600.0) $(-240.0)
TOTAL IMPLEMENTED $8,026 $1,487 $4,826
134,193
kWh
$2,691
-
kW-mo/yr
$1,349
-
MMBtu
$(-600.0) $(-240.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs