ITAC Assessment: UM0486
ITAC logo
ITAC Assessment: UM0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wood office furniture
NAICS 337214: Office Furniture (except Wood) Manufacturing
SIC 2521: Wood Office Furniture
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,168 2,414,140
kWh
Electricity Demand $99,123 5,167
kW-mo/yr
Natural Gas $44,884 5,864
MMBtu
TOTAL YEARLY COSTS $311,175
RECOMMENDED SAVINGS* $24,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,932 $3,000 $1,081
15,665
kWh
$1,851
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $896 $2,400 $896
12,993
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,120 $18,000 $20,120
291,599
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $342 $1,500 - - $342
-
MMBtu
TOTAL RECOMMENDED $24,290 $24,900 $22,097
320,257
kWh
$1,851
-
kW-mo/yr
$342
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs