| Assessment Year | 1993 |
|---|---|
| Principal Product | WHOLESALE BEEF |
| NAICS |
n/a
|
| SIC | 2011: Meat Packing Plants |
| Sales Range | $1 M to 5M |
| # of Employees | 80 |
| Plant Area |
n/a
|
| Annual Production | 33,200
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $143,436 | 1,892,732 |
kWh
|
$0.076 |
| Natural Gas | $34,643 | 6,025 |
MMBtu
|
$5.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,891 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $1,044 | $950 |
$1,044
13,775
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,350 | - |
$2,350
31,067
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $127 | $80 |
$127
1,758
kWh
|
- | - | |
| 04 | 2.2425: Use flue gases to heat process or service water | $11,880 | $18,000 | - |
$11,880
-
MMBtu
|
- | |
| 05 | 2.2136: Install / repair insulation on steam lines | $242 | $200 | - |
$242
-
MMBtu
|
- | |
| 06 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $370 | $47 | - |
$370
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,122 | - |
$1,231
16,120
kWh
|
- | $(-109.0) | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $375 | - |
$368
4,103
kWh
|
- | $7 | |
| TOTAL RECOMMENDED | $17,510 | $19,277 |
$5,120
66,823
kWh
|
$12,492
-
MMBtu
|
$(-102.0) | ||
| TOTAL IMPLEMENTED | $3,891 | $1,077 |
$3,521
46,600
kWh
|
$370
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs