ITAC Assessment: AM0678
ITAC logo
ITAC Assessment: AM0678
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Automotive cleaners, protectants, and sealers
NAICS 325612: Polish and Other Sanitation Good Manufacturing
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $50
M
to 100
M
# of Employees 101
Plant Area 84,000
ft2
Annual Production 290
Tgal
Production Hrs. Annual 2,069
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,963 721,344
kWh
Electricity Demand $15,223 2,350
kW-mo/yr
Electricity Fees $104 -
Natural Gas $9,834 888
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,125

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,360 $1,300 $630
8,450
kWh
$90
-
kW-mo/yr
$2,640
02 2.7111: Reduce illumination to minimum necessary levels $2,100 $690 $1,330
17,750
kWh
$770
-
kW-mo/yr
-
03 2.7124: Make a practice of turning off lights when not needed $1,300 - $820
10,980
kWh
$480
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $520 $30 $320
4,250
kWh
$200
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $365 $200 $230
3,070
kWh
$135
-
kW-mo/yr
-
TOTAL RECOMMENDED $7,645 $2,220 $3,330
44,500
kWh
$1,675
-
kW-mo/yr
$2,640
TOTAL IMPLEMENTED $7,125 $2,190 $3,010
40,250
kWh
$1,475
-
kW-mo/yr
$2,640
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs