Assessment Year | 2016 |
---|---|
Principal Product | Die cast machines |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3542: Machine Tools, Metal Forming Types |
Sales Range | $50 M to 100M |
# of Employees | 121 |
Plant Area |
70,000
ft2
|
Annual Production | 40
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $123,581 | 2,095,200 |
kWh
|
$0.059 |
Electricity Demand | $46,395 | 5,580 |
kW-mo/yr
|
$8.31 |
Natural Gas | $58,337 | 8,284 |
MMBtu
|
$7.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,217 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $3,158 | $5,250 |
$2,650
44,928
kWh
|
$508
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,640 | $2,000 |
$1,064
18,049
kWh
|
$576
-
kW-mo/yr
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $485 | $1,029 |
$296
5,012
kWh
|
$448
-
kW-mo/yr
|
$(-258.7)
-
MMBtu
|
- | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,573 | - | - |
$9,573
-
kW-mo/yr
|
- | $(-1,000.0) | |
05 | 2.2437: Recover waste heat from equipment | $1,361 | $150 | - | - |
$1,361
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $15,217 | $8,429 |
$4,010
67,989
kWh
|
$11,105
-
kW-mo/yr
|
$1,102
-
MMBtu
|
$(-1,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs