ITAC Assessment: UM0465
ITAC logo
ITAC Assessment: UM0465
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Die cast machines
NAICS 333517: Machine Tool Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $50
M
to 100
M
# of Employees 121
Plant Area 70,000
ft2
Annual Production 40
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,581 2,095,200
kWh
Electricity Demand $46,395 5,580
kW-mo/yr
Natural Gas $58,337 8,284
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,217 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7135: Install occupancy sensors $3,158 $5,250 $2,650
44,928
kWh
$508
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $1,640 $2,000 $1,064
18,049
kWh
$576
-
kW-mo/yr
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $485 $1,029 $296
5,012
kWh
$448
-
kW-mo/yr
$(-258.7)
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,573 - - $9,573
-
kW-mo/yr
- $(-1,000.0)
05 2.2437: Recover waste heat from equipment $1,361 $150 - - $1,361
-
MMBtu
-
TOTAL RECOMMENDED $15,217 $8,429 $4,010
67,989
kWh
$11,105
-
kW-mo/yr
$1,102
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs