Assessment Year | 2015 |
---|---|
Principal Product | brake drums and rotors |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $100 M to 500M |
# of Employees | 399 |
Plant Area |
370,000
ft2
|
Annual Production | 176,000,000
lb
|
Production Hrs. Annual | 8,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,772,198 | 90,434,247 |
kWh
|
$0.053 |
Electricity Demand | $1,762,347 | 207,826 |
kW-mo/yr
|
$8.48 |
Natural Gas | $719,727 | 75,769 |
MMBtu
|
$9.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $579,336 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $162,816 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $261,975 | $300,000 |
$555,989
10,490,372
kWh
|
- |
$(-294,014.0)
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $162,816 | $1,000 | - |
$162,816
-
kW-mo/yr
|
- | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $154,545 | $50,000 |
$172,548
3,255,632
kWh
|
$73,267
-
kW-mo/yr
|
$(-91,270.0)
-
MMBtu
|
|
TOTAL RECOMMENDED | $579,336 | $351,000 |
$728,537
13,746,004
kWh
|
$236,083
-
kW-mo/yr
|
$(-385,284.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $162,816 | $1,000 | - |
$162,816
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs