ITAC Assessment: UM0418
ITAC logo
ITAC Assessment: UM0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product handling improvement parts
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,960
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,134,579 14,084,186
kWh
Natural Gas $325,294 96,335
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $974,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,459

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $795,000 $1,715,000 $795,000
9,813,600
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,459 $84,630 $21,459
264,925
kWh
-
03 2.7232: Replace existing hvac unit with high efficiency model $151,000 $60,000 - $151,000
-
MMBtu
04 2.2437: Recover waste heat from equipment $7,257 $7,500 - $7,257
-
MMBtu
TOTAL RECOMMENDED $974,716 $1,867,130 $816,459
10,078,525
kWh
$158,257
-
MMBtu
TOTAL IMPLEMENTED $21,459 $84,630 $21,459
264,925
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs