| Assessment Year | 2011 |
|---|---|
| Principal Product | Sheet metal fabricated plates |
| NAICS | 332322: Sheet Metal Work Manufacturing |
| SIC | 3444: Sheet Metal Work |
| Sales Range | $10 M to 50M |
| # of Employees | 151 |
| Plant Area |
65,000
ft2
|
| Annual Production | 1,674,289
pieces
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $132,856 | 2,187,603 |
kWh
|
$0.061 |
| Electricity Demand | $60,787 | 4,605 |
kW-mo/yr
|
$13.20 |
| Electricity Fees | $9,248 | - |
|
- |
| Natural Gas | $99,231 | 15,000 |
MMBtu
|
$6.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,141 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,145 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $5,500 | $7,000 |
$5,500
90,505
kWh
|
- | - | |
| 02 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $8,496 | $10,350 | - | - |
$8,496
-
MMBtu
|
|
| 03 | 2.3132: Recharge batteries on during off-peak demand periods | $1,186 | - | - | $1,186 | - | |
| 04 | 2.2511: Insulate bare equipment | $1,482 | $1,157 | - | - |
$1,482
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $3,477 | $500 | - | - |
$3,477
-
MMBtu
|
|
| TOTAL RECOMMENDED | $20,141 | $19,007 |
$5,500
90,505
kWh
|
$1,186 |
$13,455
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,145 | $1,657 | - | $1,186 |
$4,959
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs