ITAC Assessment: UM0398
ITAC logo
ITAC Assessment: UM0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Sheet metal fabricated plates
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 151
Plant Area 65,000
ft2
Annual Production 1,674,289
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,856 2,187,603
kWh
Electricity Demand $60,787 4,605
kW-mo/yr
Electricity Fees $9,248 -
Natural Gas $99,231 15,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,141 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $5,500 $7,000 $5,500
90,505
kWh
- -
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $8,496 $10,350 - - $8,496
-
MMBtu
03 2.3132: Recharge batteries on during off-peak demand periods $1,186 - - $1,186 -
04 2.2511: Insulate bare equipment $1,482 $1,157 - - $1,482
-
MMBtu
05 2.2437: Recover waste heat from equipment $3,477 $500 - - $3,477
-
MMBtu
TOTAL RECOMMENDED $20,141 $19,007 $5,500
90,505
kWh
$1,186 $13,455
-
MMBtu
TOTAL IMPLEMENTED $6,145 $1,657 - $1,186 $4,959
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs