| Assessment Year | 2009 |
|---|---|
| Principal Product | Decorative Plating |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 43 |
| Plant Area |
56,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 3,536
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $90,532 | 2,546,933 |
kWh
|
$0.036 |
| Electricity Demand | $37,449 | 86,864 |
kW-mo/yr
|
$0.43 |
| Natural Gas | $250,988 | 29,961 |
MMBtu
|
$8.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $87,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $78,732 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2522: Isolate hot or cold equipment | $21,998 | $720 | - | - |
$21,998
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,988 | $23,603 |
$5,376
107,744
kWh
|
$1,612
-
kW-mo/yr
|
- | |
| 03 | 2.7241: Install outside air damper / economizer on hvac unit | $4,994 | $10,960 | - | - |
$4,994
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,766 | $1,200 | - | - |
$3,766
-
MMBtu
|
|
| 05 | 2.2136: Install / repair insulation on steam lines | $69 | $62 | - | - |
$69
-
MMBtu
|
|
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $44,552 | $36,000 |
$32,312
646,630
kWh
|
$12,240
-
kW-mo/yr
|
- | |
| 07 | 2.2511: Insulate bare equipment | $5,125 | $11,770 | - | - |
$5,125
-
MMBtu
|
|
| TOTAL RECOMMENDED | $87,492 | $84,315 |
$37,688
754,374
kWh
|
$13,852
-
kW-mo/yr
|
$35,952
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $78,732 | $72,155 |
$37,688
754,374
kWh
|
$13,852
-
kW-mo/yr
|
$27,192
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs