Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Decorative Plating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area 56,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,536
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,532 2,546,933
kWh
Electricity Demand $37,449 86,864
kW-mo/yr
Natural Gas $250,988 29,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2522: Isolate hot or cold equipment $21,998 $720 - - $21,998
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,988 $23,603 $5,376
107,744
kWh
$1,612
-
kW-mo/yr
-
03 2.7241: Install outside air damper / economizer on hvac unit $4,994 $10,960 - - $4,994
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,766 $1,200 - - $3,766
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $69 $62 - - $69
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $44,552 $36,000 $32,312
646,630
kWh
$12,240
-
kW-mo/yr
-
07 2.2511: Insulate bare equipment $5,125 $11,770 - - $5,125
-
MMBtu
TOTAL RECOMMENDED $87,492 $84,315 $37,688
754,374
kWh
$13,852
-
kW-mo/yr
$35,952
-
MMBtu
TOTAL IMPLEMENTED $78,732 $72,155 $37,688
754,374
kWh
$13,852
-
kW-mo/yr
$27,192
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs