| Assessment Year | 2008 |
|---|---|
| Principal Product | Carpet floors and trunk liners |
| NAICS | 326150: Urethane and Other Foam Product (except Polystyrene) Manufacturing |
| SIC | 2273: Carpets and Rugs |
| Sales Range | $10 M to 50M |
| # of Employees | 155 |
| Plant Area |
111,000
ft2
|
| Annual Production | 2,000,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $240,998 | 5,373,060 |
kWh
|
$0.045 |
| Electricity Demand | $223,407 | 13,149 |
kW-mo/yr
|
$16.99 |
| Electricity Fees | $13,605 | - |
|
- |
| Natural Gas | $190,925 | 19,802 |
MMBtu
|
$9.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,737 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,128 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,158 | $32,000 |
$7,612
169,728
kWh
|
$5,546
-
kW-mo/yr
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $10,585 | $10,000 | - | - |
$10,585
-
MMBtu
|
|
| 03 | 2.2515: Use optimum thickness insulation | $8,476 | $9,576 |
$8,476
95,232
kWh
|
- | - | |
| 04 | 2.7231: Use radiant heater for spot heating | $3,750 | - | - | - |
$3,750
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,390 | $5,864 |
$812
18,112
kWh
|
$1,578
-
kW-mo/yr
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,378 | $750 |
$1,199
24,041
kWh
|
$1,179
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $40,737 | $58,190 |
$18,099
307,113
kWh
|
$8,303
-
kW-mo/yr
|
$14,335
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,128 | $750 |
$1,199
24,041
kWh
|
$1,179
-
kW-mo/yr
|
$3,750
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs